1 Consultancy Services for Transmission Dept- CE/509/2007 DEWA Witnessing of T&C Activities for 11KV SWGR, LVAC, 11 KV Cables Capacitor Banks etc for 132/11KV S/s. Consultants  2007-2009 10,000,000 Completed 
2 Functional Verification of 132/11 KV SS Equipments - CUC CARGO  Siemens  Functional Verification of 11 KV SWGR,Aux. Transformer, LVAC,Capacitor Banks,11 KV Cables etc. Sub Consultants 2008-2009   Completed 
3 Functional Verifications of 11 KV SWGR - DLC-2 - 132/11 KV S/s. Siemens  Functional Verification of 11 KV SWGR.  Sub Consultants 2008-2009   Completed 
4 Functional Verifications of Transformer- Et's  Siemens  Deputation of Engineer for Power Transformer Testing  Sub Consultants 2009   Completed 
5 400/132KV - SS- REEM ISLAND  ABB - ABU DHABI  Deputation of Engineer for Testing & Commissioning works for 400/132/22 KV REEM Project. Sub Consultants 2009   Ongoing 
6 Deputation of Engineer for Transformer Testing for 132 KV - JUMMERIAH  SS   AREVA Deputation of Engineer for Aux.Transformer Testing 11/0.4Kv, 500 KVA- JUMMERIAH  SS   Sub Consultants 2009   Completed 
7 Functional Verifications for 132/11KV SS Equipments  DANWAY LLC Dubai  Funct Verifications of  AuxTrafo, 11 KV SWGR,LVAC,11KV Cables & Cap Bank etc. Sub Consultants 2009   Completed 
8 DEWA Consultancy Services for Transmission & Project  Dept- CE/0281/20097 DEWA Witnessing of T&C Activities for Protection, SWGR, Transformers, Fire Protection, EHV cables, Project Management,Design Review etc for400/132/33/11 KV SS  Consultants  2009   Ongoing 
9 Consultancy Services for Project  Dept- CN/0471/2008 DEWA Monitoring of Project works- Electrical, Civil, Building Services, Design Review ,Conducting Progress Meeting, Material Inspections etc for 400/132/33/11KV SS.  Consultants  2008-2009 3,070,000 Completed 
10 Design Review & Site Management  PB Power Dubai  Review of Drawings & Documents for 132/11 KV - 12 S/s  Sub Consultants 2008-2009   Completed 
11 132KV - Protection Modifications works  DANWAY LLC            Dubai  Protection Modifications for 132 KV - 07CKTs at DUBAL Consultants  2009   Completed 
12 Owner Consultancy services for 132/11 KV SS - Tijara Town -2 Dubai Properties Consultancy Services for Prep of Tender Specs, Tender Docs, Review of Engineering Design, Site Project Management, Witnessing of T&C Works, Handing over of site & services during Defect Liability Period. Consultants  2008-2009 4,830,000 (apr) Under Hold due to the Economic Recession in Dubai 
13 Modifications Works for 33 KV Capacitor Bank & Load Transfer Schemes. DANWAY LLC            Dubai  Protection Modification  for Capacitor Bank- NOVAR Schemes  for 33 KV - 5 Nos SS  & Load Transfer Schemes for 1 Nos  33 KV SS. Consultants  2009   Completed 
14 Owner Consultancy services for 132/11 KV SS -Pearl Dubai  Dubai Pearl Consultancy Services for Prep of Tender Specs, Tender Docs, Review of Engineering Design, Site Project Management, Witnessing of T&C Works, Handing over of site & services during Defect Liability Period. Consultants  2009-2012 4,230,000 (apr) Ongoing 
15 11KV SWGR Review              Works  Hidi Rae Consulting Engineers Review of 11 KV GA, Protection Schemes for 11 KV SWGR for Strata Complex Project - AL Ain  Sub Consultants 2009   Completed 
16 Protection Modification for 33/11 KV NETWORKS FOR 8 Nos Saudi Electricity Con.Co ( SEECO) S/s  Electrical Relay Establishment  Complete Modification of Existing Protection System for BB, OHL, Transformer Feeder & Cable Feeder for 8 Nos - 33/11 KV _ SEECO SS- SAUDI ARABIA  Sub Consultants 2009   Completed 
17 Relays Setting Calculations for DHAID MS/PS - 132 /11 KV FEWA SS REMCON - ABU DHABI  Relay Setting Calculations for 132/11 KV  DHAID MS & PS Stations- FEWA  Sub Consultants 2009   Completed 
18 HVAC Calculations for Extension Works for DHAID MS-132 /11 KV FEWA SS REMCON - ABU DHABI  HVAC  Calculations for  Extension works for 132/11 KV  DHAID MS Station- FEWA  Sub Consultants 2009   Completed 
19 Final Commissioning of Pot Line 1 & 2  - EMAL Smelter Complex DANWAY LLC Dubai  Deputation of Engineer for final Commissioning of Electrical System for Pot Line 1 & 2 - EMAL SMELTER COMPLEX - ABU DHABI  Sub Consultants 2009   Completed 
20 Laod Flow & Short Circuit System Study Analysis- 33/11 KV System GECO - SHARJAH  Comprehensive Laod Flow , Short Circuit, Time Current Coordination, Netwrok Stability ,Motor feeders including Feeders at 420 & 4200.with CYME SOFTWARE  Consultants  2010   Ongoing 
21 Detail Civil Engineering of Extension of Cap Bank in Water Distribution SS - AJMAN  GECO - SHARJAH  Civil Engineering for Extension of 2 Nos Cap Bank Room with Trech & Interlock Tile Arrangements Consultants  2010   Ongoing 
22 Functional Veification for  POWER  Trasformer - 132/11KV & Earthing Transformer - 11/0.4KV - 500KVA  ETA  Performing Functional Verification of Earthing Transformer- 11/0.4KV including TAND & SFRA Tests- Qty 12 Nos  Consultants  2010 210,000 Completed 
23 Relays Setting Calculations for Cable Rehabilation Project - 7 Nos 132 KV SS  REMCON - ABU DHABI  Relay Setting Calculations for 9 Nos132KV cable Ckts - TRANSCO  Sub Consultants 2010 55,000 Completed 
24 Relays Setting Calculations for 132/33 KV Mobile SS  REMCON - ABU DHABI  Relay Setting Calculations for 1 Nos 132KV  Mobile SS - TRANSCO  Sub Consultants 2010 43,000 Completed 
25 Design of 11KV OHL for Single Ckt & Double CKT -120KM  GECO - SHARJAH  Detail Design for 11KV - Single Ckt OHL Lines -80KM & 40KM Double Ckt for Proejcts in Nothern Emirates - FEWA Consultants  2010   Ongoing 
26 11 KV & LV Distribution Networks for WATANI RESIDENTIAL COMP - ABU DHABI  Jazeeera Emirates Power  Details Scheme for 11 KV & LV Networks for WATANI RESIDENTIAL COMPLEX in ABU DHBAI  Sub Consultants 2010   Completed 
27 Relays Setting Calculations for 33/11 KV for 7 S/s IN Al AIN  REMCON - ABU DHABI  Relay Setting Calculations for 7 Nos 33KV  S/s In AL-AIN where the Electromechanical relays are repalced with Numerical RELAYS Sub Consultants 2010 37,000 Ongoing 
28 Relays Setting Calculations for 33/11 KV S/s - 7 Nos In Al AIN  REMCON - ABU DHABI  Relay Setting Calculations for 7 Nos 33KV  S/s In AL-AIN where the Electromechanical relays are repalced with Numerical RELAYS Sub Consultants 2010 37,000 Completed 
29 Functional Veification for  POWER  Trasformer - 132/33KV Power Transformer 35/50 MVA ETA  Performing Functional Verification of Earthing Transformer- 11/0.4KV including TAND & SFRA Tests- Qty 12 Nos  Consultants  2010 210,000 Completed 
30 400/220KV GRID STATION    SUB CONSULTANCY FOR 400/220KVSS  SUB CONSULTANTS 2010 210,000 Ongoing 
31 Detail Civil Engineering for 33kV SWITCHING STATION - JABEL ALI PP GECO - SHARJAH  Civil Engineering for 33kV SWITCHING STATION AT JABEL ALI POWER PLANT  Consultants  2010   Ongoing 
32 Detail Civil Engineering for SKP-59 Project - Ynabu North  CUMBERLAND  Civil Engineering for Dehyration Station at SKP-59 Project Ybnabu North  Sub-Consultants  2011   Under final stage of Negotiations